File 1907/1549 - Laverton Health Rate - extension of time.

Identity area

Reference code

AU WA S268-1907/1549

Title

Laverton Health Rate - extension of time.

Date(s)

  • 1904-09-26 - 1907-09-26 (Accumulation)

Level of description

File

Medium

Status

Context area

Name of creator

AU WA A34 - CENTRAL BOARD OF HEALTH (1886-11-17 - 1911-05-31)

Name of creator

Archival history

Content and structure area

Scope and content

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Open

Conditions governing access (legacy)

Conditions governing reproduction

Language of material

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

Allied materials area

Existence and location of originals

Related units of description

Related units of description

Access points

Place access points

Description control area

Level of detail

Language(s)

Script(s)

Sources

Accession area

Related subjects

Related people and organizations

Related places